The WaterBlock membranes are applied directly to the primed substrates.
- Clean and dry the substrate
- Prime the substrate with ELASTOCOL H20 or ELASTOCOL STICK, using a brush or roller.
- Allow the Primer to dry. Primed substrates must be covered the same day.
- Unroll, align and cut the membrane into required lengths.
- Peel back about 6 inches of release sheet.
- Position the membrane, apply it to the substrate continuing to peel back the release sheet.
- When the full length of membrane is installed, press firmly with roller to avoid any air pockets